Taylor Marine Construction, Inc. installed heavy Marine Loading Arms on an active refinery dock. We mobilized our 2018 Liebherr LR-1250 on our new 60’ wide crane barge, experienced personnel to the site, engineered and designed proper rigging and safely conducted the required critical lifts to successfully install a complicated device in a safety-minded refinery.