We have the expertise to evaluate various conditions, size pile hammers, and provide cost effect solutions to your piling needs.

For example, we were retained during an emergency caused by a failed bulkhead. A high-end processing plant was in immediate danger due to rapid soil loss into the Port Arthur Ship Channel. An emergency sheet piling cutoff bulkhead was needed immediately. Impact or vibratory pile driving would have rapidly accelerated the soil loss, so Taylor Marine Construction, Inc. immediately mobilized a Geiken Pile Press and drove the pile using “Silent Piler” technology. Quick thinking and familiarity with the latest industry technology enabled Taylor Marine Construction, Inc. to successfully save the facility, saving our clients millions of dollars in damages.